Punjab Solar Tubewell Scheme 2026: Real Status, Eligibility and Your Options

  • Post published:

By the PEMCO Engineering Team, Lahore. Updated 19 November 2026.

Short answer

  • The Punjab government’s tubewell solarisation scheme took applications until 31 December 2024. Phase one covers 8,000 tubewells, chosen by a draw in February 2025.
  • The subsidy is a fixed amount: Rs500,000 for 10 kW, Rs750,000 for 15 kW and Rs1 million for 20 kW. The farmer pays the rest.
  • Delivery has been slow. The programme was moved between departments, put on hold for review in 2025, and was still being installed district by district in 2026.
  • As of 19 November 2026 we found no official notice of a new application round. Websites saying “register now for 2026” are not government sites.

Most farmers have two questions: can I still apply, and if not, is it worth going solar on my own? This guide sets out what the scheme actually offered, who qualified, where it stands, and how to avoid the usual mistakes when a tubewell is converted to solar without proper design.

What the scheme offers

The scheme pays a fixed subsidy towards a solar system that replaces a diesel or electric tubewell. It is part of the Chief Minister’s Kissan Package. When it was first announced in July 2024, the CM said the government would cover 67% of the cost and the farmer 33%, as The News reported. The final scheme fixed the subsidy by system size:

Solar system sizeGovernment subsidyWho pays the rest
10 kWRs500,000Farmer
15 kWRs750,000Farmer
20 kWRs1,000,000Farmer
Subsidy amounts as reported by ARY News and Profit, February 2025.

According to Profit, 87% of the tubewells picked for phase one ran on diesel and 13% on electricity. Officials told the CM that farmers would save more than Rs10,000 a day on energy. Treat that as the government’s estimate: the real saving depends on how many hours you pump and what you were paying for diesel.

Who was eligible

The criteria were published with the application window in December 2024. ARY News listed them as:

  • Resident of Punjab, with agricultural land in your own name in the district where you apply.
  • One facility per family.
  • A tubewell connection installed on or before 31 March 2024, with no unpaid bills or defaults.
  • Water table up to 60 feet.
  • Documents: CNIC, NADRA family registration certificate (FRC), fard-e-malkiat for the land, and the last paid tubewell bill.

Dawn described the scheme as being for small farmers with 1 to 25 acres. Reports did not all agree on every detail, so the helpline (0800-17000) is the place to confirm your own case.

Where the scheme stands now

Demand was huge, and delivery has been slow. Here is the timeline from published reports:

WhenWhat happened
July 2024Scheme announced: 67% government, 33% farmer
December 2024Applications open on the government portal until 31 December; Rs1 billion allocated for subsidies (Business Recorder)
February 2025Over 530,000 applied, about 385,000 found eligible; 8,000 chosen by draw; target to finish phase one by June 2025
May 2025Work stalled after the programme moved from the Agriculture Department’s water management wing to the Energy Department; vendors and farmer groups complained
2025Programme put on hold pending a review of its plan (PC-1), after concerns that contractor prices were above market rates
February 2026Installation continuing: in Okara, equipment delivered for 12 of 17 tubewells (Business Recorder)
Compiled from the news reports linked. We could not read the official portal directly, so check your own status on the helpline.

One detail from the review explains why the government price looked high. The Energy Department secretary told The News that its contractors must pay taxes and provide one year of operation and maintenance, which local installers often leave out. That is worth remembering when you compare private quotes too.

Beware of “2026 registration” websites

Search for this scheme and most results are private websites announcing “new registration” or “80% subsidy” for 2026. None of the ones we checked linked to an official notice. Before you share your CNIC or land papers anywhere:

  • The official portal was cmstp.punjab.gov.pk, and the helpline is 0800-17000. A government scheme will be on a .gov.pk address.
  • Never pay an “agent” to register you or to move you up the list. Selection was by draw.
  • A new phase would be announced by the Punjab government and reported by the main newspapers. If you can’t find it there, assume it is not real.

The same pattern happened with the CM’s free solar panel scheme for homes; our guide to the CM Punjab free solar scheme covers its real status.

If you were selected in the draw

Call the helpline with your CNIC and ask three things: your current status, which vendor or contractor is assigned to your district, and how much you have to pay and when. Profit reported that selected farmers could choose a vendor in their own district.

When the vendor comes, check the same things you would on a private job: the panel and pump-drive brand and model on paper, a solid mounting structure, proper earthing, and what the one-year maintenance actually covers.

Want a second opinion on a tubewell solar quote?

WhatsApp us your motor’s horsepower, voltage, the depth of your bore and the quote you have. Our engineers will tell you if the system is sized right. Free site survey in Lahore and nearby areas, video consultation anywhere in Punjab.

If you weren’t: going solar on your own

Most of the 385,000 eligible applicants were never going to get one of 8,000 subsidised systems. Many farmers have gone ahead privately, and the economics can still work, especially if you are replacing diesel. These are the points that decide whether a solar tubewell works well or disappoints.

1. Start from the pump, not the panels

Write down the motor’s horsepower and voltage, the depth to water in summer, and how much water you need per day. The solar drive and array are sized from these. Buying “a 15 kW system” before knowing the pump is how farmers end up with a system that runs only at midday.

2. Use a proper solar pump drive

A solar pump inverter (a variable frequency drive built for solar) lets the motor run at reduced speed in the morning and evening instead of stalling. It must match the motor’s power and voltage. Arrays are usually sized somewhat larger than the drive: one manufacturer’s recommended layouts, in the INVT GD100-PV manual, work out to roughly 1.25 to 1.3 times the drive rating.

3. Build the structure for wind and theft

Ground-mounted arrays in open fields face storms and theft. Use galvanised steel, concrete footings and anti-theft bolts, and keep the drive in a locked room. Mono PERC or N-type panels both work; our comparison of monocrystalline vs polycrystalline panels explains the basics.

4. Plan for cloudy days and winter

A solar-only tubewell pumps in daylight and slows in fog and cloud. If a crop needs water on a fixed schedule, keep the grid connection or diesel engine as backup, with a changeover switch.

5. Get earthing and cabling right

Long DC runs across a field need correctly sized cable, DC isolators and surge protection, and the frame and drive must be earthed. Undersized cable and missing earthing are among the most common faults in field solar installations.

A word on water. Solar makes pumping almost free once installed, so it is tempting to run the tubewell all day. Pump what the crop needs. Falling water tables raise everyone’s pumping costs, including yours.

If your farmhouse or dera also has a grid connection, the rules for exporting power changed this year; see our guide to net billing in Pakistan.

Frequently asked questions

Can I still apply for the Punjab solar tubewell scheme?

Applications closed on 31 December 2024, and phase one’s 8,000 tubewells were chosen by draw in February 2025. As of 19 November 2026 we found no official notice of a new application round. Confirm on the helpline 0800-17000 before trusting any website that says registration is open.

How much subsidy does the scheme give?

Rs500,000 for a 10 kW system, Rs750,000 for 15 kW and Rs1 million for 20 kW. The farmer pays the remaining cost.

Who was eligible?

Punjab residents with agricultural land in their own name in the district of application, one facility per family, a tubewell connection installed by 31 March 2024 with no defaults, and a water table up to 60 feet. Dawn described it as aimed at farmers with 1 to 25 acres.

Why is the scheme delayed?

Reports cite the transfer of the programme from the Agriculture Department to the Energy Department and a 2025 review of its plan after concerns that contractor prices were above market rates. Installation was still continuing district by district in 2026.

What size solar system does a tubewell need?

It depends on the motor’s horsepower and voltage, the water depth and how much water you need. The solar pump drive must match the motor, and the panel array is usually somewhat larger than the drive rating. Have an engineer size it from your pump details, not from a package price.

Talk to an engineer about solar for your farm

PEMCO Engineering designs on-grid, hybrid and off-grid solar systems across Punjab and has installed more than 1 MW of solar. PEMCO is a private company and is not part of the government scheme. See our solar system installation service. Call or WhatsApp 0322 4773987, or use the contact form for a free consultation.

Written by the PEMCO Engineering Team. Scheme details checked on 19 November 2026 against reports in Dawn, The News, Business Recorder, ARY News and Profit. The official portal could not be read automatically; confirm your own status on the helpline 0800-17000.