Solar Installation in Rawalpindi
On-grid, hybrid and off-grid solar for homes, shops and factories in Rawalpindi, planned around IESCO net billing, load-shedding and the city’s tight, crowded rooftops.
- 1 MW+ solar installed
- 10+ years experience
- 7+ Punjab cities covered
- Video consultation
By the PEMCO Engineering Team. Last updated 25 November 2026.
PEMCO Engineering designs and installs on-grid, hybrid and off-grid solar systems for houses, shops, offices and factories in Rawalpindi, and supports the IESCO net billing application. We are a registered Pakistani engineering company with more than 10 years of experience and more than 1 MW of solar installed. Our office is in DHA Phase 3, Lahore, and we work across Rawalpindi, Islamabad and the rest of Punjab.
Rawalpindi is not just “Islamabad’s twin” when it comes to solar. Plots are smaller, roofs are shared with water tanks and stair rooms, many older houses are single-phase, and outages on some feeders run longer. This page explains what that means for the system you should buy.
Video consultation anywhere in Rawalpindi and Punjab. Send a photo of your latest IESCO bill and a few photos or a short video of your roof on WhatsApp. Our engineers go through it with you on a video call, then prepare a written quote. (Our free site survey covers Lahore and nearby areas.)
Which solar system suits a Rawalpindi home or business?
For most Rawalpindi homes the best value is a hybrid system with a modest battery, because it keeps the fans, lights and fridge running during load-shedding. An on-grid system costs less but switches off whenever IESCO’s supply goes, which is a safety rule, not a fault. On-grid makes most sense for shops, offices and workshops that use their power in daylight and already have a UPS or generator.
On-grid (net billing)
Best for: shops, offices, clinics, schools and workshops with daytime load.
Outages: no power from solar while the grid is down.
Trade-off: lowest cost; exported units earn little since 2026.
Hybrid (grid + batteries)
Best for: houses on feeders with regular load-shedding, and evening use.
Outages: yes, essential loads run from the battery.
Trade-off: batteries add cost and must be replaced after their cycle life.
Off-grid
Best for: farmhouses on Adiala Road and Chakri Road, poultry sheds and plots with no reliable connection.
Outages: not affected.
Trade-off: the battery bank must cover every night and every cloudy spell.
Honest advice: if your roof is very small, heavily shaded by the next building, or your monthly use is low, solar can take a long time to pay back. Already using a UPS? A hybrid inverter often replaces it, so compare against the cost of a new UPS and batteries, not against nothing. We say so on the video call rather than sell you a system that disappoints.
IESCO net billing in 2026: what it means in Rawalpindi
Since 9 February 2026, a new solar connection in Rawalpindi gets net billing from IESCO, not net metering. You pay your normal tariff for every unit you import and receive a much lower rate for every unit you export. Dawn reported that NEPRA’s notified rules cut the buyback rate for future prosumers to about Rs10-11 a unit, while imports cost Rs37-55 a unit before taxes, and Arab News later put the 2026 export rate at Rs8.13 a unit. Either way, a unit you use yourself is worth several times a unit you export.
That changes how a Rawalpindi system should be designed. The aim is now to use as much of your solar power as possible during the day: run the water pump, washing machine, iron and ACs while the sun is up, and size the panels to your daytime load rather than to the biggest export you could get. Existing net metering customers are a separate case; our guide to net billing in Pakistan under NEPRA’s 2026 rules explains both.
Three things decide whether your IESCO application goes through:
Fitting solar on a crowded Rawalpindi roof
On a 5 or 7 marla house the usable roof, not the budget, usually sets the system size. A modern 580-620 W panel is roughly 2.3 m by 1.1 m, so a 10 kW array needs about 16-18 panels and a clear, unshaded area of around 50-60 square metres once walkways are left. Water tanks, the stair room (mumtee), parapet walls and the house next door all cast shadows that cut output.
- Raised frames let panels sit above tanks and parapets and leave the roof usable underneath.
- Panels over the mumtee or a small car porch can add 2-4 panels where space is tight.
- Shade mapping: we check the roof at morning, noon and afternoon from your photos or video, because one shaded panel can pull down a whole string.
- Load-bearing: older roofs with weak slabs or seepage need a structural check before a steel frame goes up.

Illustration: panels being fixed to mounting rails. (Stock photo, Pexels)
How we size a system for Rawalpindi’s weather
In Rawalpindi one kW of panels produces about 6.8 units a day in summer but only about 3.75 units a day in winter, so we size from a full year of IESCO bills. These are profileSOLAR’s estimates for Rawalpindi based on NASA weather data: 6.39 units in spring, 6.80 in summer, 4.99 in autumn and 3.75 in winter. The same source recommends south-facing panels at a fixed tilt of about 30 degrees.
| System size | Summer (about units/day) | Winter (about units/day) | Typical fit |
|---|---|---|---|
| 5 kW | 34 | 19 | 5 marla house, 1-2 ACs in daytime |
| 10 kW | 68 | 38 | 10 marla house or small shop, 3-4 ACs |
| 15 kW | 102 | 56 | 1 kanal house, clinic or office |
| 20 kW | 136 | 75 | Larger house, workshop or small factory |
The figures are average-day estimates from the seasonal numbers above; real output depends on shade, dust, panel temperature and tilt. “Typical fit” is a rough guide only: your bill and roof decide the right size.
Winter is the trap. Rawalpindi homes often run electric heaters and geysers in December and January, exactly when the panels make about half their summer output. If your winter bill is your biggest, a hybrid system with a battery for evening use can be a better choice than more panels.
Solar and load-shedding in Rawalpindi
Only a hybrid or off-grid system gives you power during load-shedding; an on-grid system stops when IESCO’s supply stops. If outages on your feeder are part of daily life, choose a hybrid inverter and decide in advance which circuits it should back up, usually lights, fans, the fridge, the internet router and the water pump.
Pick backup circuits
Put essential loads on the inverter’s backup output. Keep ACs and heaters on the grid side unless the battery is large.
Size the battery for hours
A 5 kWh lithium battery runs about 500 W of essential load for roughly 8 hours after allowing for reserve and losses.
Use daytime surplus
Under net billing, charging your own battery in the day is worth more than exporting the same units to IESCO.
Our comparison of on-grid, hybrid and off-grid solar after net billing works through the battery maths in detail, and our guide to lithium-ion vs lead-acid batteries covers battery choice.
Safe installation: storms, hail and roof work
Rooftop solar work is dangerous when done carelessly, and Rawalpindi’s spring storms test every frame. In July 2026 one worker was killed and another injured after falling while installing solar panels in the Dhok Mustaqim area of Rawalpindi, 24 News reported. In April 2025 a hailstorm brought hailstones up to 1.2 inches across in neighbouring Islamabad and damaged rooftop panels there, according to Dawn.
Ask how they work at height
Ask the installer how the team works safely on your roof edge and parapet, and do not let anyone work on a wet or windy day.
Anchored structure
Frames should be bolted to proper footings or chemical anchors, not just weighted with bricks, and checked for wind load.
Hail rating
Standard IEC 61215 panel tests use 25 mm ice balls. Ask for the panel’s hail test data and glass thickness.
Brands we have installed include Jinko, LONGi, JA Solar and Canadian Solar panels, and Inverex, Growatt, Solis, Sungrow, Tesla and other inverters. We compare their published data for your roof rather than pick a brand on price alone. Whoever you hire, make sure earthing, DC surge protection and lightning protection are written into the quote.
DHA, Bahria Town, cantonment areas and Punjab schemes
Rawalpindi is in Punjab, so Punjab government solar schemes apply here, unlike in Islamabad; society rules depend on where your house is. Check both before you sign a contract.
- DHA Islamabad-Rawalpindi: DHAI&R requires a solar firm registered with it, which submits a 3D design under the DHAI&R Byelaws 2023 before a site visit and Building Control approval, as its website explains.
- Bahria Town, cantonment areas and private societies have their own approval steps. Ask the society or cantonment board office which drawings and forms it needs before any frame goes up.
- CM Punjab free solar scheme: aimed at households using up to 200 units a month. See our guide to the CM Punjab free solar panel scheme for its status and how to avoid fake registration sites.
- Farms and tube wells in Rawalpindi district: see the real status of the Punjab solar tubewell scheme before you plan a solar pump.
What decides the cost of a solar system in Rawalpindi?
The cost depends on system size, batteries, the panel and inverter brands, the mounting structure and any IESCO work such as a three-phase conversion. Prices in Pakistan move with import costs and the exchange rate, so we quote in writing at current prices instead of publishing a list that goes out of date. Our solar system price guide for Pakistan (2026) lists current published market ranges by size.
System size (kW)
Panels, inverter and structure scale with it.
Batteries
Often the biggest add-on in a hybrid system.
Inverter type
On-grid inverters cost less than hybrid ones.
Raised structure
Frames above tanks and parapets need more steel and footings.
Cabling and protection
Earthing, surge protection and lightning arresters.
IESCO and approvals
Three-phase conversion or load extension if needed, plus any society approval.
Send your IESCO bill and roof photos for a written quote at current prices.
How PEMCO’s solar installation works in Rawalpindi
Send your bill
WhatsApp your latest IESCO bill and roof photos or a short video.
Video consultation
Our engineers review your load, sanctioned load, phase and roof space with you on a video call.
Design and written quote
System type, size, equipment, backup circuits and structure agreed in writing.
Installation and testing
Our in-house installation team fits the structure, panels, inverter, cabling, earthing and protection, then commissions the system.
IESCO net billing
Net billing application support, plus the documents your society asks for.
After-sales
Call or WhatsApp us about faults or inverter errors after handover.
Areas we cover in Rawalpindi
We install solar across Rawalpindi city, cantonment and the surrounding tehsils, including Satellite Town, Westridge, Chaklala, Saddar, Gulraiz, Bahria Town, DHA, Adiala Road and Gujar Khan. We also work in Islamabad, Murree, Lahore, Faisalabad, Gujranwala, Gujrat and the rest of Punjab. See our pages on solar installation in Islamabad and solar installation in Lahore, and our main solar system installation service page for every system type.
- Satellite Town
- Westridge
- Chaklala
- Saddar
- Gulraiz
- Bahria Town
- DHA
- Adiala Road
- Gujar Khan
- Islamabad
- Murree
- Lahore
- Faisalabad
- Gujranwala
- Gujrat

Illustration: washing panels with plain water. (Stock photo: Spaxido Spaxido, Pexels)
Frequently asked questions
Can I still get net metering from IESCO in Rawalpindi?
Not for a new connection. Since 9 February 2026, new solar users in Rawalpindi get net billing: IESCO charges imported units at your normal tariff and credits exported units at a much lower rate, around Rs8-11 a unit. Existing net metering agreements are treated separately.
Is solar still worth it in Rawalpindi in 2026?
Yes, when the system is sized to the power you use in daylight. Each unit you use straight from your roof saves the full IESCO tariff, while an exported unit earns far less. A hybrid system also keeps essential loads running during load-shedding.
What size solar system do I need for a 5 or 10 marla house in Rawalpindi?
It depends on your bill, sanctioned load and roof space. In Rawalpindi 1 kW of panels makes about 6.8 units a day in summer and about 3.75 in winter, so a 5 kW system makes roughly 34 units a summer day and 19 a winter day. On small roofs the shade-free area often limits the size.
Will solar work during load-shedding?
Only a hybrid or off-grid system will. An on-grid system switches off when IESCO’s supply goes, for the safety of line workers. With a hybrid inverter and a battery, essential loads such as lights, fans, the fridge and the router keep running.
Do I need approval to install solar in DHA or Bahria Town Rawalpindi?
In DHA Islamabad-Rawalpindi, yes: you need a solar firm registered with DHAI&R, which submits a 3D design for approval. Bahria Town, cantonment areas and other societies have their own procedures, so check with the office before work starts.
Do you offer site surveys in Rawalpindi?
Our free site survey covers Lahore and nearby areas. For Rawalpindi we start with a video consultation: send your IESCO bill and roof photos or a short video on WhatsApp and our engineers guide you on a video call, then prepare a written quote.
Talk to a solar engineer about your Rawalpindi home