Short answer
- Net metering ended for new solar connections in Pakistan on 9 February 2026. New users get net billing instead.
- If you signed a net metering agreement before 9 February 2026, you keep its terms until the agreement expires.
- Adding capacity to an old connection after that date moves it to net billing.
- Under net billing, exports earn Rs8.13 a unit (2026), so systems should be sized for daytime self-use.
Updated 18 November 2026. This page used to explain how to get a new net meter. That is no longer possible, so we have rewritten it for the people still searching for net metering: existing users who want to know what they keep, and new buyers who need to know what replaced it.
What net metering was
Net metering let a solar owner offset each unit exported to the grid against a unit imported, so the bill was based on the net difference. It was set up under NEPRA’s 2015 net metering regulations. A bidirectional meter recorded both directions, your distribution company (LESCO, IESCO, FESCO, GEPCO and the others) netted them each billing cycle, and any surplus left over was paid for at a buyback rate.
Because an exported unit was worth almost as much as an imported one, many owners sized systems to export as much as possible. That made the old payback calculations look very attractive, and it is why net metering grew so fast in cities like Lahore and Islamabad.
What changed in 2026
On 9 February 2026 NEPRA repealed the 2015 regulations and notified the Prosumer Regulations 2026, which replace net metering with net billing for new consumers. Under net billing, imports and exports are no longer netted unit for unit. Every imported unit is charged at your normal tariff, and every exported unit is credited at NEPRA’s national average energy purchase price, Rs8.13 a unit for 2026, as Arab News reported.
| Net metering (old) | Net billing (since 9 Feb 2026) | |
|---|---|---|
| Who gets it | Agreements signed before 9 Feb 2026 | All new connections and capacity increases |
| How exports count | Netted against imports unit for unit | Credited at the national average purchase price |
| Export value | Close to the value of an imported unit | Rs8.13 a unit (2026) |
| Best system design | Export as much as possible | Use as much as possible in daylight |
NEPRA later softened the rules. In April 2026 it amended them so existing agreements are protected until they expire, and removed the fee and licence for systems of 25 kW or below. In August 2026 the Power Division told DISCOs and PITC to verify applications still pending from consumers who had paid their demand notice before 9 February. Our full guide to net billing in Pakistan under NEPRA’s 2026 rules covers all of this in detail.
If you already have net metering
If you signed a net metering agreement before 9 February 2026, your connection keeps the old terms until the agreement expires. Three things protect that position:
- Know your expiry date. Find it on your agreement and plan around it; after expiry, expect the connection to move to the rules then in force, which today means net billing.
- Think before adding panels. LESCO, for example, processes any capacity increase after 9 February as net billing. A small extra array could cost you the better terms on the whole system.
- Keep the system healthy. Your exported units are worth far more than a net billing user’s, so clean panels and fix inverter faults quickly. Our guide to common solar inverter problems helps.
Applied before 9 February but never connected? If you paid your demand notice before the cutoff, keep the paid receipt. DISCOs and PITC were told in August 2026 to verify such cases. In Lahore, our LESCO net metering and net billing application guide explains how to check the status.
Not sure which rules apply to you?
WhatsApp a photo of your electricity bill and your net metering agreement, and our engineers will tell you what you keep and whether expanding makes sense.
If you are buying solar now
New buyers should size a system around the power they use during the day, because a unit used from your own roof saves the full tariff while an exported unit earns about Rs8. That usually means a smaller on-grid system than people bought under net metering, or a hybrid system with batteries if most of your use is in the evening. Households using up to 200 units a month should first check the CM Punjab free solar panel scheme.
The application itself also changed. You must be a three-phase consumer, the system cannot be bigger than your sanctioned load, and your DISCO must refuse new connections once solar on your transformer reaches 80% of its rating. City-specific details are on our pages for solar installation in Lahore (LESCO) and solar installation in Islamabad (IESCO).

Frequently asked questions
Is net metering still available in Pakistan?
Not for new solar connections. NEPRA replaced net metering with net billing on 9 February 2026. Consumers with a net metering agreement signed before then keep it until it expires, and some applicants who paid their demand notice before 9 February are being verified and connected on the old terms.
What happens to my net metering when my agreement expires?
Expect the connection to move to the rules in force at that time, which today means net billing. Check the expiry date on your agreement and plan your system around it.
Will adding more panels move me to net billing?
Yes. DISCOs such as LESCO treat a capacity increase after 9 February 2026 as a new net billing case, so adding panels to an old net metering connection can cost you the old terms. Ask before you expand.
What is the export rate under net billing?
Exported units are credited at NEPRA’s national average energy purchase price, which is Rs8.13 a unit for 2026, while imported units are charged at your normal tariff.
Plan your solar system for the 2026 rules
PEMCO Engineering designs on-grid, hybrid and off-grid solar for homes, commercial buildings and factories across Punjab, with net billing application support. Call or WhatsApp 0322 4773987 or use our contact form. Free site survey in Lahore and nearby areas, and video consultation anywhere in Punjab.
Written by the PEMCO Engineering Team. Rules checked against NEPRA’s Prosumer Regulations 2026 and news reports on 18 November 2026. General information, not legal advice; confirm current requirements with your distribution company.